Zero Resistance
On March 1, 2022, Zerone entered the market as an electrical installation company. However, the scope of his activities soon expanded. Currently, the company offers full MEP services to customers, which means that customers from Zerone can receive not only electrical, but also water, fire, HVAC (heating, cooling, ventilation) and automated systems design and installation services. Zerone uses the latest design method - BIM (Building Informational Modeling), which involves 3D visualization of all systems in the building. Such a method is a guarantee that the customer has the most accurate information about the expected results.The company already has 50 successfully completed and 15 ongoing projects. "Zero resistance" - the entire team of Zerone unites around this slogan and idea. Our team's goal is for customers to get maximum results in minimum time.
Read More
Client
Employee
Current project
Completed project
▪️How important and valued is the profession of an electrician today?
▪️Do certain professions lose their relevance in the era of artificial intelligence?
This topic was the focus of a feature prepared at the initiative of the Construction and Engineering Sector Skills Organization.
Read More
Autodesk’s representative Pawel Zerkacz paid an official visit to ZERONE, where he introduced the team to the latest functionalities across Autodesk’s software platforms and conducted hands-on training sessions.
Read More
Zerone organized an educational workshop on an active construction site for architecture students from the Technical University. The primary objective of the workshop was to underscore the importance of collaborative work between architecture and engineering, and to highlight the practical integration of these disciplines.
Read More