As part of the project, the following tasks were completed:
▫️ Building electrification;
▫️ Low-voltage system installation;
▫️ Lighting system installation;
▫️ Electrical panel installation;
▫️ Heating and cooling systems;
▫️ Ventilation;
▫️ Fire detection system;
▫️ Automatic fire suppression system.